Application Reference Number 2019/1013
Description Planning application for National Grid's Visual Impact Provision (VIP) project involving the following works:1) Construction of a new sealing end compound, including permanent access; 2) Construction of a temporary haul road from Brook Hill Lane including widened bellmouth; 3) Construction of a temporary Trans Pennine Trail Diversion to be used for approximately 12 - 18 months; following construction approximately 410m of said diversion surface would be retained permanently; and 4) Erection of two bridges (one temporary and one permanent) along the Trans Pennine Trail diversion
Site Address Land off Brook Hill Lane, Dunford Bridge, Barnsley, Sheffield
Received Date 12 August 2019
Validated Date 6 September 2019
Decision Under Consideration
Status Registered
Applicant Name Mrs Andrea Key
Applicant Address National Grid House Warwick Technology Park Gallows Hill Warwick CV34 6DA
Parish Dunford Parish
Ward Penistone West Ward
Application Type Full
Determination Level Planning Regulatory Board
Agent Name n/a
Case Officer Name Hannah Andrew
Case Officer Telephone 01226 775752
Case Officer Email developmentmanagement@barnsley.gov.uk
Environmental Assessment Required No
Received Date 12 August 2019
Validated Date 6 September 2019
Consultation Expiry Date 25 May 2020
Provisional Committee Date 30 June 2020
Target Decision Date 14 November 2019
Extended Target Decision Date Not yet determined
Decision Date Not yet determined
Address
10 Don View, Dunford Bridge, Barnsley, S36 4TE
11 Don View, Dunford Bridge, Barnsley, S36 4TE
12 Don View, Dunford Bridge, Barnsley, S36 4TE
7 Don View, Dunford Bridge, Barnsley, S36 4TE
8 Don View, Dunford Bridge, Barnsley, S36 4TE
9 Don View, Dunford Bridge, Barnsley, S36 4TE
BAR HOUSE, Brook Hill Lane, Carlecotes, Barnsley, S36 4TF
BROOKSIDE FARM, Brook Hill Lane, Dunford Bridge, Barnsley, S36 4TG
DICK ROYD FARM, Brook Hill Lane, Carlecotes, Barnsley, S36 4TG
ELTOCK FARM, Brook Hill Lane, Carlecotes, Barnsley, S36 4TG
LOWER TOWNHEAD FARM, Brook Hill Lane, Dunford Bridge, Barnsley, S36 4TG
RAILWAY COTTAGES, Windle Edge, Dunford Bridge, Barnsley
SOUTH VIEW, Windle Edge, Dunford Bridge, Barnsley, S36 4TF
STONEYGATE HOUSE, Windle Edge, Dunford Bridge, Barnsley, S36 4TF
STREET RECORD, Brook Hill Lane, Dunford Bridge, Barnsley
THE BARN, Windle Edge, Dunford Bridge, Barnsley, S36 4TF
THE STANHOPE ARMS, Windle Edge, Dunford Bridge, Barnsley, S36 4TF
THURLMOOR CARAVAN SITE, Brook Hill Lane, Carlecotes, Barnsley, S36 4TD
THURLMOOR FARM, Brook Hill Lane, Carlecotes, Barnsley, S36 4TD
TOWNHEAD, Brook Hill Lane, Dunford Bridge, Barnsley
UPPER TOWNHEAD FARM, Brook Hill Lane, Dunford Bridge, Barnsley, S36 4TG
WINDSOVER, 13 Don View, Dunford Bridge, Barnsley, S36 4TF
WINSCAR LODGE, 6 Don View, Dunford Bridge, Barnsley, S36 4TE
Company Name Address
Biodiversity Officer Level 4, Westgate Plaza 1, PO Box 604, Barnsley, S70 9FE
Conservation Officer Level 1 Westgate Plaza 1 PO BOX 604 Barnsley
Contaminated Land Officer Regulatory Services Barnsley MBC PO Box 602 Barnsley S70 9FB
CPRE .
Dunford Parish Council Clerk to Dunford Parish Council 3 Cliff Hill Court, Holmfirth, Huddersfield. HD9 1JF
Environment Agency Sustainable Places team (Yorkshire Area) Environment Agency Lateral 8 City Walk Leeds LS11 9AT 8 City Walk Leeds LS11 9AT
Forestry Officer Level 1 Westgate Plaza One PO Box 604 Barnsley S70 9FE
Highway Drainage Westgate Plaza 1 PO Box 601 Barnsley S70 9FA
Highways DC Highways and Engineering Level 2 Westgate Plaza 1 PO Box 604 Barnsley S70 9FE
Kirklees Council Kirklees Technical Services Civic Centre Huddersfield
Legal Westgate Plaza 1 PO Box 600 Barnsley S70 9EZ
Natural England Brian Davis Team Leader, Government Team (West) Yorkshire and Humber Region Natural England 25 Queen Street Leeds LS1 2UN
Network Rail Property Square One 4 Travers Street Manchester M1 2NY
Parks Supervisor Parks Services Stronger, Safer & Healthier Communities. Communities Directorate Beevor Court 1 Barnsley S71 1HG
Peak District National Park Authority Aldern House Baslow Road Bakewell Derbyshire DE45 1AE
Policy Level 2 Westgate Plaza 1 PO Box 604 Barnsley S70 9FE
Pollution Control Westgate Plaza 1 PO Box 602 Barnsley S70 9FB
Post Office Telephones Telephone House Charter Square Sheffield S1 1BA
Public Health Level 1 Westgate Plaza 1 Westgate Barnsley
Public Rights of Way BMBC
Sheffield City Council Forward and Area Planning Howden House 4th Floor Union Street Sheffield S1 2SH
South Yorkshire Archaeology Service Planning, Transport and Highways Howden House 1 Union Street Sheffield S1 2SH
South Yorkshire Mining Advisory Service Level 2 Westgate Plaza 1 PO Box 604 Barnsley S70 9FE
Ward Councillors c/o Member Services Town Hall Barnsley
Yorkshire Water Services Limited Land Use Planning Yorkshire Water Services Ltd. Midway Western Way Halifax Road BRADFORD BD6 2LZ
Yorkshire Wildlife Trust 1 St Georges Place York YO24 1GN
Please note these documents are for viewing only. Attempting to save a copy or copies may infringe on copyright laws.
Amended Documentation
EAR_PD Appendices List.pdf ( 0.03 MB )
EAR_PD Contents Page.pdf ( 0.1 MB )
EAR_PD_Figure List.pdf ( 0.04 MB )
FIG 2.2 - WORKS BOUNDARY DURING OHL REMOVAL PHASE - SHEET 1 OF 6.pdf ( 3.73 MB )
FIG 2.2 - WORKS BOUNDARY DURING OHL REMOVAL PHASE - SHEET 2 OF 6.pdf ( 1.31 MB )
FIG 2.2 - WORKS BOUNDARY DURING OHL REMOVAL PHASE - SHEET 3 OF 6.pdf ( 1.28 MB )
FIG 2.2 - WORKS BOUNDARY DURING OHL REMOVAL PHASE - SHEET 4 OF 6.pdf ( 1.92 MB )
FIG 2.2 - WORKS BOUNDARY DURING OHL REMOVAL PHASE - SHEET 5 OF 6.pdf ( 2 MB )
FIG 2.2 - WORKS BOUNDARY DURING OHL REMOVAL PHASE - SHEET 6 OF 6.pdf ( 1.83 MB )
Metric 2.0 Calculation Final_updated_VIP_V2 - FINAL_NO_OFFSITE_LD_081019_with A+J1+B.xlsm ( 4.96 MB )
NG VIP Project Langsett Traffic + Air Quality Response.pdf ( 0.27 MB )
P10727-00-001-803-05 Clough Beck Culvert Option 2 Reduced .pdf ( 1.57 MB )
PDD_33492_LAY_033A_P2.pdf ( 0.54 MB )
PDD_33492_LAY_077_P1.pdf ( 0.2 MB )
PDD-33492-LAY-030-P10 (1).pdf ( 1.13 MB )
PDD-33492-LAY-030-P10.pdf ( 1.13 MB )
PDD-33492-LAY-039_P18.pdf ( 1.74 MB )
PDD-33492-LAY-082 P3.pdf ( 0.54 MB )
PDD-33492-LAY-082_P1-Temporary Car Park Layout.pdf ( 0.88 MB )
PDD-33492-LAY-083_P1-AP7 Visibility Splays.pdf ( 0.41 MB )
PDD-33492-LAY-083_P5 (1).pdf ( 1.42 MB )
PDD-33492-LAY-083_P5.pdf ( 1.42 MB )
PDD-33492-LAY-086_P4.pdf ( 1.47 MB )
PDD-33492-LAY-088_P1.pdf ( 1.01 MB )
PDD-33492-LAY-089.pdf ( 2.09 MB )
PDD-33492-LAY-090.pdf ( 2.07 MB )
PDD-33492-LAY-091.pdf ( 1.22 MB )
PDD-33492-LAY-092.pdf ( 1.22 MB )
PDD-33492-LAY-84.pdf ( 0.81 MB )
PDD-33492-LAY-85.pdf ( 0.65 MB )
Peak District_VIP_TrafficProfile V16-Contractor Comparison 20.11.19.pdf ( 0.08 MB )
PKD-660952-001-Redline_Consents_Rev08.pdf ( 7.73 MB )
PKD-660952-002_PLA_Location_Plan_Rev06.pdf ( 1.87 MB )
VIP Peak District East Response to HE and BMBC.pdf ( 0.49 MB )
VIP Peak East Net Gain ProposalsFinalforissue.pdf ( 0.42 MB )
Application form
20191013 AppForm NoPersonalData.pdf ( 1.61 MB )
Plans
20191013 EAR_PD Fig 8.8 Historic Map 1915_Figure 8.8 Plan of Dunford Bridge Station Rev00.pdf ( 2.21 MB )
20191013 Elevations.pdf ( 0.33 MB )
20191013 PDD33492 LAYFIGURE 2.4 Combined working areas within Wogden Foot Local Wildlife Site.pdf ( 3.29 MB )
20191013 PDD33492LAY002 A_Layout Showing Proposed New Cable Sealing End Compounds.pdf ( 1.4 MB )
20191013 PDD33492LAY003_Elevations Showing Proposed New Cable Sealing End Compounds.pdf ( 0.39 MB )
20191013 PDD33492LAY0101_Temporary Car Park Layout Sheet 1 of 2.pdf ( 0.4 MB )
20191013 PDD33492LAY0102_Temporary Car Park Layout Aerial Sheet 2 of 2.pdf ( 0.54 MB )
20191013 PDD33492LAY030_Preliminary Bellmouth Layout AP7.pdf ( 0.25 MB )
20191013 PDD33492LAY036_FIGURE 2.1 CONSTRUCTION WORKS BOUNDARY DURING CONSTRUCTION PHASE SHEET 1 OF 5.pdf ( 1.24 MB )
20191013 PDD33492LAY037_FIGURE 2.1 CONSTRUCTION WORKS BOUNDARY DURING CONSTRUCTION PHASE SHEET 2 OF 5.pdf ( 1.63 MB )
20191013 PDD33492LAY038_FIGURE 2.1 CONSTRUCTION WORKS BOUNDARY DURING CONSTRUCTION PHASE SHEET 3 OF 5.pdf ( 1.51 MB )
20191013 PDD33492LAY039_FIGURE 2.1 CONSTRUCTION WORKS BOUNDARY DURING CONSTRUCTION PHASE SHEET 4 OF 5.pdf ( 1.04 MB )
20191013 PDD33492LAY040_FIGURE 2.1 CONSTRUCTION WORKS BOUNDARY DURING CONSTRUCTION PHASE SHEET 5 OF 5.pdf ( 1.34 MB )
20191013 PDD33492LAY046_FIGURE 2.3 PROPOSED PERMANENT OPERATIONAL DEVELOPMENT SHEET 1 OF 4.pdf ( 0.68 MB )
20191013 PDD33492LAY047_FIGURE 2.3 PROPOSED PERMANENT OPERATIONAL DEVELOPMENT SHEET 2 OF 4.pdf ( 0.25 MB )
20191013 PDD33492LAY048_FIGURE 2.3 PROPOSED PERMANENT OPERATIONAL DEVELOPMENT SHEET 3 OF 4.pdf ( 0.45 MB )
20191013 PDD33492LAY049_FIGURE 2.3 PROPOSED PERMANENT OPERATIONAL DEVELOPMENT SHEET 4 OF 4.pdf ( 0.43 MB )
20191013 PDD33492LAY050_TPT DIVERSION ANALYSIS SHEET 1.pdf ( 0.78 MB )
20191013 PDD33492LAY051_TPT DIVERSION ANALYSIS SHEET 2.pdf ( 1.04 MB )
20191013 PDD33492LAY052_TPT DIVERSION ANALYSIS SHEET 3.pdf ( 0.91 MB )
20191013 PDD33492LAY053_TPT DIVERSION ANALYSIS SHEET 4.pdf ( 1 MB )
20191013 PDD33492LAY054_TPT DIVERSION ANALYSIS SHEET 5.pdf ( 0.88 MB )
20191013 PDD33492LAY055_TPT DIVERSIONTEMPORARY BRIDGE 2 GENERAL ARRANGEMENT.pdf ( 1.36 MB )
20191013 PDD33492LAY056_TPT DIVERSIONTEMPORARY BRIDGE 2 CUTFILL ANALYSIS AND PROFILE.pdf ( 1.26 MB )
20191013 PDD33492LAY057_PERMANENT BRIDGE GENERAL ARRANGEMENT.pdf ( 0.22 MB )
20191013 PDD33492LAY058_TEMPORARY BRIDGE 1 AND 2 SIDE ELEVATION.pdf ( 0.43 MB )
20191013 PDD33492LAY072 Public Rights of Way.pdf ( 1.27 MB )
20191013 PDD-33492-LAY-080_Elevations Showing Prop new Cable Sealing End Compound adjacent to Tower 4Z0157R + Exist Tower Re.pdf ( 0.33 MB )
Superseded Documentation
20191013 PKD 660952_003 Site_Plan.pdf ( 1.48 MB )
20191013 PKD_660952_001_Redline Consents.pdf ( 2.53 MB )
20191013 PKD_660952_002_Location_Plan.pdf ( 1.46 MB )
PDD-33492-LAY-086_P03.pdf ( 1.4 MB )
Supporting Documentation
20191013 Attachment Summary.pdf ( 0.05 MB )
20191013 EAR_PD FIG 10.1 Study Area Rev00.pdf ( 1.92 MB )
20191013 EAR_PD FIG 10.2 Superficial Geology Rev00.pdf ( 1.06 MB )
20191013 EAR_PD Fig 10.3 Bedrock Geology Rev00.pdf ( 1.55 MB )
20191013 EAR_PD Fig 10.4 Borehole Locations Rev00.pdf ( 2.62 MB )
20191013 EAR_PD Fig 10.5 Contamination Rev00.pdf ( 1.91 MB )
20191013 EAR_PD Fig 10.6 Sensitive Receptors Rev00.pdf ( 1.04 MB )
20191013 EAR_PD Fig 11.1 Soilscape Rev00.pdf ( 3.18 MB )
20191013 EAR_PD Fig 11.2 ALC_Pre1988 Rev00.pdf ( 3.49 MB )
20191013 EAR_PD Fig 11.3 ALC_Post1988 Rev00.pdf ( 4.27 MB )
20191013 EAR_PD Fig 11.4 Agri-Environment and Forestry Schemes Rev00.pdf ( 3.86 MB )
20191013 EAR_PD Fig 13.1 Study Area_Figure 13.1 Study Area Rev00.pdf ( 2.91 MB )
20191013 EAR_PD Fig 13.2 Tourism Businesses_Figure 13.2 Touirsm Businesses Rev00.pdf ( 2.93 MB )
20191013 EAR_PD Fig 13.3 Recreational Facilities_Figure 13.3 Recreational Facilities Rev00.pdf ( 2.07 MB )
20191013 EAR_PD Fig 13.4 PRoWs and CycleRoutes_Figure 13.4 Cycle Routes, PRoW and Promoted Routes Rev00.pdf ( 2.07 MB )
20191013 EAR_PD Fig 14.1 Baseline Noise Monitoring Locations Pg 1.pdf ( 5.14 MB )
20191013 EAR_PD Fig 14.1 Baseline Noise Monitoring Locations Pg 2-6.pdf ( 10.63 MB )
20191013 EAR_PD Fig 3.1 AoS_Perm_and_Temp_Works Rev00.pdf ( 2.34 MB )
20191013 EAR_PD Fig 6.1 LVIA Study Area Rev00.pdf ( 36.22 MB )
20191013 EAR_PD Fig 6.10 Settlement and Infrastructure Rev00.pdf ( 18.1 MB )
20191013 EAR_PD Fig 6.11 Local Landscape Character Rev00.pdf ( 28.17 MB )
20191013 EAR_PD Fig 6.12 Viewpoint Locations 1 of 2 Rev00.pdf ( 36.16 MB )
20191013 EAR_PD Fig 6.12 Viewpoint Locations 2 of 2 Rev00.pdf ( 1.65 MB )
20191013 EAR_PD Fig 6.2 ZTV up to 10km Rev00.pdf ( 2.22 MB )
20191013 EAR_PD Fig 6.3 ZTV of Proposed Wogden Foot SEC Rev00.pdf ( 25.95 MB )
20191013 EAR_PD Fig 6.4 ZTV of Existing Pylons to be Removed Rev00.pdf ( 19.95 MB )
20191013 EAR_PD Fig 6.5 Comparative ZT Rev00.pdf ( 25.28 MB )
20191013 EAR_PD Fig 6.6 National and Regional Landscape Character Rev00.pdf ( 8.06 MB )
20191013 EAR_PD Fig 6.7 Landform and Drainage 1 of 2 Rev00.pdf ( 4.48 MB )
20191013 EAR_PD Fig 6.7 Landform and Drainage 2 of 2 Rev00.pdf ( 3.02 MB )
20191013 EAR_PD Fig 6.8 Tree Cover Rev00.pdf ( 35.49 MB )
20191013 EAR_PD Fig 6.9 Recreation Routes and Open Access Land 1 of 2 Rev00.pdf ( 13.86 MB )
20191013 EAR_PD Fig 6.9 Recreation Routes and Open Access Land 2 of 2 Rev00.pdf ( 3.07 MB )
20191013 EAR_PD Fig 7.1 Ecological Designations Plan_Statutory and Non Statutory Designations Plan Rev00.pdf ( 11.62 MB )
20191013 EAR_PD Fig 7.2 Phase 1 Habitat Survey_Updated Phase 1 Habitat Survey Plan Rev00.pdf ( 1.36 MB )
20191013 EAR_PD Fig 8.1 Heritage Constraints_Figure 8.1 Heritage Constraints Map Rev00.pdf ( 2.34 MB )
20191013 EAR_PD Fig 8.2 Constraints 5km.pdf ( 3.52 MB )
20191013 EAR_PD Fig 8.4 Historic Map Enclosure Thurlstone_Figure 8.4 Enclosure Map for Thurlstone Rev00.pdf ( 3.45 MB )
20191013 EAR_PD Fig 8.5 Historic Map 1843_Figure 8.5 1843 1st Series Ordnance Survey Map Rev00.pdf ( 3.06 MB )
20191013 EAR_PD Fig 8.6 Historic Map 1854_Figure 8.6 1854 Ordnance Survey Map Rev00.pdf ( 1.44 MB )
20191013 EAR_PD Fig 8.7 Historic Map 1893_Figure 8.7 1893 Ordnance Survey Map Rev00.pdf ( 3.61 MB )
20191013 EAR_PD Fig 8.9 Historic Map 1964_Figure 8.9 1964 Ordnance Survey Map Rev00.pdf ( 3.34 MB )
20191013 EAR_PD Fig 9.1 Peak District 1 in 100 year and Climate Change Flood Depths Rev00.pdf ( 2.39 MB )
20191013 EAR_PD Fig 9.2 Main Surface Water Features Rev00.pdf ( 2.92 MB )
20191013 EAR_PD Fig 9.3 Surface Water WFD Status and Objectives Rev00.pdf ( 1.86 MB )
20191013 EAR_PD Fig 9.4 Licensed Water Abstractions Rev00.pdf ( 5.15 MB )
20191013 EAR_PD Fig 9.5 Groundwater Body WFD Status Rev00.pdf ( 2.42 MB )
20191013 EAR_PD Fig 9.6 Environment Agency Flood Map for Planning Rev00.pdf ( 2.47 MB )
20191013 EAR_PD Fig 9.7 EA Risk of Flooding from Surface Water Rev00.pdf ( 2.74 MB )
20191013 EAR_PD Fig 9.8 EA Risk of Flooding from Reservoirs Rev00.pdf ( 2.45 MB )
20191013 EAR_PD Fig 9.9 EA Risk of Flooding from Groundwater Rev00.pdf ( 2.65 MB )
20191013 EAR_PD_Appendix 14.1 Baseline Noise data Rev00.pdf ( 0.16 MB )
20191013 EAR_PD_Appendix 14.2 Construction Plant Rev00.pdf ( 0.12 MB )
20191013 EAR_PD_Appendix 14.3 Mitigation Rev00.pdf ( 0.08 MB )
20191013 EAR_PD_Appendix 14.4 Construction Predictions Rev00.pdf ( 0.39 MB )
20191013 EAR_PD_Appendix 2A EMF Report Rev00.pdf ( 0.63 MB )
20191013 EAR_PD_Appendix 2B CEMP Rev00.pdf ( 0.74 MB )
20191013 EAR_PD_Appendix 2B.1 NG Environmental Sustainability Policy Rev00.pdf ( 0.21 MB )
20191013 EAR_PD_Appendix 2B.2 NG EMS manual Rev00.pdf ( 0.3 MB )
20191013 EAR_PD_Appendix 2B.3 LEMP Rev00.pdf ( 12.6 MB )
20191013 EAR_PD_Appendix 2B.4 Archaeological WSI Rev00.pdf ( 3.23 MB )
20191013 EAR_PD_Appendix 2B.5 CTMP Rev00.pdf ( 19.51 MB )
20191013 EAR_PD_Appendix 2B.6 TPT Management Plan Rev00.pdf ( 1.72 MB )
20191013 EAR_PD_Appendix 2B.7 Asbestos Management Plan Rev00.pdf ( 6.06 MB )
20191013 EAR_PD_Appendix 3A_Screening Opinion Rev00.pdf ( 1.03 MB )
20191013 EAR_PD_Appendix 3B_Scoping Opinion Rev00.pdf ( 0.72 MB )
20191013 EAR_PD_Appendix 4A Statement of Community Engagement Rev00.pdf ( 5.78 MB )
20191013 EAR_PD_Appendix 6.A LVIA Methodology Rev00.pdf ( 0.43 MB )
20191013 EAR_PD_Appendix 6.B Landscape Character Rev00.pdf ( 0.31 MB )
20191013 EAR_PD_Appendix 6.C National and Regional Planning Policy Rev00.pdf ( 0.28 MB )
20191013 EAR_PD_Appendix 6.D Viewpoints Assessment Rev00.pdf ( 4 MB )
20191013 EAR_PD_Appendix 6.E Landscape Value and Susceptibility Rev00.pdf ( 0.27 MB )
20191013 EAR_PD_Appendix 7A Botanical Report_PD Botanical Report Rev00.pdf ( 6.72 MB )
20191013 EAR_PD_Appendix 7B Breeding Bird Report Rev00.pdf ( 2.58 MB )
20191013 EAR_PD_Appendix 7C Great Crested Newt Report Rev00.pdf ( 5.44 MB )
20191013 EAR_PD_Appendix 7D Badger Report Rev00.pdf ( 2.4 MB )
20191013 EAR_PD_Appendix 7E Bat Report Rev00.pdf ( 5.6 MB )
20191013 EAR_PD_Appendix 7F Reptile Report Rev00.pdf ( 2.07 MB )
20191013 EAR_PD_Appendix 7G Water Vole and Otter Report Rev00.pdf ( 1.67 MB )
20191013 EAR_PD_Appendix 7H Terrestrial Invertebrate Report Rev00.pdf ( 1.06 MB )
20191013 EAR_PD_Appendix 7I Wintering Bird Report Rev00.pdf ( 11.18 MB )
20191013 EAR_PD_Appendix 7J HRA Screening Report Rev00.pdf ( 5.92 MB )
20191013 EAR_PD_Appendix 7K Fish Report Rev00.pdf ( 2.57 MB )
20191013 EAR_PD_Appendix 7L Aquatyic Invertebrate Report Rev00.pdf ( 1.73 MB )
20191013 EAR_PD_Appendix 7M AIA Report Rev00.pdf ( 7.62 MB )
20191013 EAR_PD_Appendix 7N Policy Compliance Rev00.pdf ( 0.12 MB )
20191013 EAR_PD_Appendix 8A Gazetteer of Heritage Assets Rev00.pdf ( 0.33 MB )
20191013 EAR_PD_Appendix 8B GI Watching Brief and Borehole Results Rev00.pdf ( 11.03 MB )
20191013 EAR_PD_Appendix 8C LiDAR Data Assessment Rev00.pdf ( 19.89 MB )
20191013 EAR_PD_Appendix 9A Methodology Flow Chart Rev00.pdf ( 0.13 MB )
20191013 EAR_PD_Appendix 9B Water Resources Receptors Screening Rev00.pdf ( 0.2 MB )
20191013 EAR_PD_Appendix 9C TPT Diversion Impact Tables Rev00.pdf ( 0.09 MB )
20191013 EAR_PD_Appendix 9D SEC Impact Tables Rev00.pdf ( 0.1 MB )
20191013 EAR_PD_Appendix 9E 400kV Cable Rev00.pdf ( 0.11 MB )
20191013 EAR_PD_Appendix 9G Construction of Replacement Pylon 4ZO 157R Impact Tables Rev00.pdf ( 0.1 MB )
20191013 EAR_PD_Appendix 9H Temporary Elements Impact Tables Rev00.pdf ( 0.09 MB )
20191013 EAR_PD_Appendix 9I FRA_Final Rev00.pdf ( 0.48 MB )
20191013 EAR_PD_Appendix 9I.A River Modelling Technical Note 10 Oct 2017 Rev00.pdf ( 1.29 MB )
20191013 EAR_PD_Appendix 9I.B Topography Rev00.pdf ( 2 MB )
20191013 EAR_PD_Appendix 9I.C Bridges Design CAD Drawings Rev00.pdf ( 2.02 MB )
20191013 EAR_PD_Appendix 9I.D Bridge Impact Assessment Technical Note Rev00.pdf ( 10.5 MB )
20191013 EAR_PD_Appendix 9J SuDS Strategy Rev00.pdf ( 0.25 MB )
20191013 EAR_PD_Appendix 9J.A SUDS National Grid TS_2.10.09 Rev00.pdf ( 0.03 MB )
20191013 EAR_PD_Appendix 9J.B Summary of Flood Risk Issues_Final Rev00.pdf ( 0.05 MB )
20191013 EAR_PD_Appendix 9J.C Incorporation of SuDS principles_Final Rev00.pdf ( 0.07 MB )
20191013 EAR_PD_Appendix 9J.D Total new hardstanding areas_Final Rev00.pdf ( 0.01 MB )
20191013 EAR_PD_Appendix 9J.E SUDS Calculations Final Rev00.pdf ( 0.04 MB )
20191013 EAR_PD_Appendix 9K Photographic log following site walkover on 24_11_16 Rev00.pdf ( 6.85 MB )
20191013 EAR_PD_Chapter 1 Introduction Rev00.pdf ( 0.23 MB )
20191013 EAR_PD_Chapter 10 Geology Rev00.pdf ( 0.85 MB )
20191013 EAR_PD_Chapter 11 Agriculture and Land Use Rev00.pdf ( 0.32 MB )
20191013 EAR_PD_Chapter 12 Transport Rev00.pdf ( 0.79 MB )
20191013 EAR_PD_Chapter 13 Rev00.pdf ( 0.56 MB )
20191013 EAR_PD_Chapter 14 Noise Rev00.pdf ( 0.55 MB )
20191013 EAR_PD_Chapter 15 Cumulative Rev00.pdf ( 0.29 MB )
20191013 EAR_PD_Chapter 2 Project Description Rev00.pdf ( 2.75 MB )
20191013 EAR_PD_Chapter 4 Consultation Rev00.pdf ( 0.18 MB )
20191013 EAR_PD_Chapter 5 Planning Policy Rev00.pdf ( 0.11 MB )
20191013 EAR_PD_Chapter 6 LVIA_Rev00.pdf ( 2.25 MB )
20191013 EAR_PD_Chapter 7 Ecology Rev00.pdf ( 1.52 MB )
20191013 EAR_PD_Chapter 8 Archaeology Rev00.pdf ( 1.74 MB )
20191013 EAR_PD_Chapter 9 Water Resources Rev00.pdf ( 0.61 MB )
20191013 PD Planning Statement.pdf ( 3.32 MB )
20191013 PD_Design and Access Statement Rev00.pdf ( 0.45 MB )
20191013 PD_Environmental Assessment Summary Rev00 (2).pdf ( 1.53 MB )
20191013 PD_Environmental Assessment Summary Rev00.pdf ( 1.53 MB )
20191013 PD_Main Options Appraisal 2019_Final Rev00.pdf ( 15.04 MB )
20191013 PD_Photomontage Report Rev00.pdf ( 41.53 MB )
20191013 PD_Planning_Statement_Rev00.pdf ( 3.32 MB )
3312-TAD Peak District ATC Report (Sep 16).xlsm ( 9.95 MB )
33492 Peak District (East) Rail Response090320.pdf ( 0.17 MB )
33492 Peak District (East) VIP Highways Technical Note 20200330.pdf ( 0.2 MB )
BNG Appendix A_Green_Infrastructure_Corridor_Buffer.pdf ( 0.23 MB )
BNG Appendix B_PreConstructionPhase1.pdf ( 0.43 MB )
BNG Appendix C_PreConstruction_UKHab.pdf ( 0.35 MB )
BNG Appendix D_PostConstruction_UKHab.pdf ( 0.49 MB )
BNG Appendix E_Car_Park_General_Arrangement_Planting.pdf ( 4.41 MB )
BNG Appendix F Calculation Final_updated_VIP_Baseline 03_04_20.xlsm ( 4.95 MB )
BNG Appendix G Calculation Final_updated_VIP_24_04_20.xlsm ( 4.88 MB )
BNG Metric 2.0 Report BASELINE ONSITE ONLY 03_04_20.doc.pdf ( 0.34 MB )
BNG NG_VIP_PDE Biodiversity Net Gain Assessment_24_04_20_FINALRev1a.pdf ( 5.97 MB )
BNG NG_VIP_PDE_Crow Edge_Management Plan_FINALRev1.pdf ( 3.47 MB )
BNG Willow Tit Enhancement Addendum.pdf ( 0.3 MB )
BNG Willow Tit Enhancement Red+Blue Areas_Wogden Foot.pdf ( 0.36 MB )
Brook Hill Lane Windle Edge, 85th Percentile Speeds Calculation.xlsx ( 0.02 MB )
EAR_PD_Chapter 3 Environmental Assessment Process Rev04_final.pdf ( 0.27 MB )
EAR_PD_Glossary_Rev01.pdf ( 0.36 MB )
NG VIP _ Area 5a - Tree Planting.pdf ( 0.42 MB )
NG VIP _ Area 5b - Tree Planting Updated.pdf ( 0.35 MB )
Peak District Construction Traffic - Access Point Identified.xlsx ( 2.14 MB )
Peak District Forward Visibility Analysis.xlsx ( 0.08 MB )
VIP Peak East Carbon Management Statement.pdf ( 0.53 MB )